Thames Conservancy

The Thames Conservancy was a historical body responsible for the management of the River Thames in England. It was founded in 1857, initially replacing the jurisdiction of the City of London up to Staines and later taking responsibility for the whole river from Cricklade in Wiltshire to the sea at Yantlet Creek on the Isle of Grain. Responsibilities were reduced when the Tideway was transferred to the Port of London Authority in 1909 and in 1972 the Conservancy was taken into the Thames Water Authority.

Contents

History

Background

The stretch of river between the town of Staines, just to the west of London, and Yantlet Creek had been claimed by the City of London since 1197 under a charter of Richard the Lionheart.[1] In 1771 the Thames Navigation Commission was established from a body created twenty years earlier to handle navigation on the river.[2] Although the Commissioners were active in establishing locks and weirs above Staines, they did not interfere with the jurisdiction of the City of London.

The City of London built a series of locks from Teddington to Penton Hook at the beginning of the nineteenth century.[3] They also used material from the demolished Old London Bridge to support the embankments between Sunbury and Shepperton.[4]

However trouble arose around 1840 when the government proposed building the Victoria Embankment and The Crown claimed title to the river bed. The dispute simmered on for 17 years.[5]

Meanwhile, as a result of competition from the railways, the volume of traffic on the river had been drastically reduced. Income from tolls fell from £16,000 in 1839 to less than £8,000 in 1849, while maintenance charges for 1850 were estimated at nearly £7000.[6] The City authority's unwillingness to pay for necessary expenditure led to complaints. By Act of Parliament in 1857 the Crown reclaimed its rights and transferred it to the new Conservancy.

First Conservancy (1857)

The City of London handed its inventory to the Thames Conservancy in October 1857. In June 1857 the first stone of a new lock at Teddington had been laid at the present position, being the central of the three locks. The Conservancy opened it in 1858 together with the narrow skiff lock, (known as "the coffin").[7] and the Conservancy soon imposed regulations. In 1858 a toll of 15 shillings was imposed on every steam vessel passing Teddington Lock, and a speed limit set to five miles per hour. This was amended to 5 mph with the stream and 4 mph against it. Netting from Richmond to Staines was prohibited for ever. The new authority reaffirmed the rights of anglers against interference from landowners and received a notice from the water-bailiff drawing attention to the " improper practice of letting boats for hire to inexperienced persons".[8] At this time the management of the bulk of the upstream river was the responsibility of the Thames Navigation Commissioners, but this changed in 1866.

Second Conservancy (1866)

In 1866 it was considered expedient to put the navigation of the whole of the River under one management It was said that the Thames Commissioners were too numerous, the locks and weirs were in a bad condition and income was insufficient to pay for maintenance. It was believed that under single management with the upper river maintained properly and with lower tolls overall the traffic would increase. Under an Act of 6 August 1866, the Thames Conservancy took over management of the river from Cricklade to Yantlet Creek, a distance of 177 miles (285 km).[9]

Under the act, all locks canals and other works of the commissioners were transferred to the Conservancy. In addition provision was made for all weirs to be transferred to the Conservancy from private owners. Former owners of weirs were freed from liabiliy but two weirs at Buscot and Eaton remained to the owner of Buscot Park. Most weirs belonged to the twenty eight water-mills still operating between Oxford and Staines and the entitlement to water of the mills, many of which dated back to Domesday Book, was recognised. No new flow of sewage into the river or its tributaries was allowed and existing sewage works were to be removed. New revenue was raised by a £1000 per annum charge on each of the five water companies.[10] The Southwark and Vauxhall, Grand Junction and West Middlesex water companies had set up their works at Hampton in the 1850s after it became illegal to take water from the Tideway. The Lambeth and Chelsea water companies had moved initially to Seething Wells but later relocated to East Molesey. Whereas the City of London owned the river bed for its part of the river, the Thames Commissioners did not and hence Thames Conservancy did not acquire the ownership of the river bed for the section above Staines which remained (and remains) the property of the riparian owners.

In August 1866 the Conservancy inspected works between Oxford and Windsor and in October settled a table of tolls.[11] Bell Weir Lock had collapsed in June and was rebuilt the following year.[12] In 1868 tolls were placed on three of the four locks then above Oxford - St John's, Buscot and Pinkhill Locks. Rushey Lock was omitted and there were no tolls on the weirs. This reflects the poor state of navigation above Oxford.[13] Some of the old locks on the rest of the river were still wooden pens and these were gradually renewed or replaced. Works completed in 1869 included the rebuilding of Romney Lock and the addition of a boat slide at Teddington. In 1870 Hambleden Lock and Benson Lock were rebuilt, followed by Day's Lock in 1871 and Godstow Lock in 1872.[14] In the 1870s it is recorded that Teddington weir collapsed twice causing enormous damage.[15]

In 1872 Conservance promised to reopen navigation between Radcot and Newbridge by repairing Rushey Lock but in 1874 recognised that they lacked the funds to meet promise. There were regular complaints at this time about the poor state of river particularly in upper reaches and the persistence of sewage.[16]

Lock replacements continued with Shiplake and Cleeve in 1874, Caversham in 1875, Whitchurch in 1876 and Bell Weir in 1877. In 1883 the Conservancy removed the lock at Chalmore Hole at Wallingford, after many years petitioning by residents of Wallingford for its retention. The weirs at Hambleden were built in 1884 and the public right of way across the river sustained by building the walkway. Bray Lock was rebuilt in 1885.[17]

The Thames Preservation Act was passed in 1885 to enshrine the preservation of river for public recreation. It prohibited shooting on the river which had become a cause of concern. The act noted "It is lawful for all persons for pleasure or profit to travel or to loiter upon any and every part or the river" (apart from private cuts).[18] The river had become exceedingly popular for sport and leisure. Many regattas or "aquatic fetes" had been instigated and Jerome K Jerome's Three Men in a Boat published in 1889 described a typical boating journey.

Lock replacements continued with Marsh in 1888, Temple in 1890 and Cookham in 1892 The first new lock was built at Radcot Lock in 1892, and Chertsey Lock was lengthened in 1893.[19] A major work in 1894 was the Richmond Lock and weir complex built to ensure that there is always at least a 5 feet 8 inches (1.73 m) depth of water in the River between Richmond and Teddington.[20][21][22][23]

Another act was passed in 1894 which consisted mainly of tidying up legislation.[24] The Conservancy finally addressed navigation above Oxford replacing the existing weirs with locks and footbridges where the was a right of way. New locks were Grafton Lock and Northmoor Lock in 1896 and Shifford Lock in 1898. Also in 1898 the conservancy rebuilt Pinkhill and Rushey.[25] Downstream, Boveney was rebuilt in 1898, with the old lock replaced by a boat slide and Shepperton was also rebuilt on a different alignment in 1899.[26]

By the end of the 19th century the advance in the size of ships and the growth of the Port of London raised questions of management and a Royal Commission reported in 1900 recommending that a single body take responsibility for the Port.

Meanwhile at Teddington, the barge lock, the largest lock on the river at 650 feet (200 m), was built in 1904–1905.[27] Locks rebuilt in 1905 included Abingdon, St Johns, Sonning and Osney. Molesey Lock was replaced in 1906 and Mapledurham Lock in 1908.[28]

After separation of the Port of London

In 1908 an Act transferred responsibility for the Tideway including Richmond Lock to the Port of London Authority, which began its duties on 31 March 1909. The demarkation point boundary was set at the boundary between the parishes of Teddington and Twickenham at a point marked by an obelisk 350 yards (320 m) below Teddington Lock .[29] The Thames Conservancy remained responsible for the non-tidal river between Cricklade and Teddington.

Lock rebuilds took place at Penton Hook in 1909 and Hurley in 1910. In 1912 the Conservancy undertook major works at Boulter's Lock, which inolved the purchase of Ray Mill Island. Chertsey Lock was lengthened in 1913 and Marsh Lock rebuilt in 1914. Goring Lock was rebuilt in 1921 with a third central set of gates and Godstow Lock rebuilt in 1924. In 1927 a new lock was built at Sunbury, the old one being retained. Marlow Lock and Iffley Lock were redeveloped in the same years. In 1928 the improvement to navigation above Oxford was finally completed with the building of Eynsham Lock and King's Lock.

The next significant undertaking was the digging of Desborough Cut between 1930 and 1935. The 3/4/mile (1 km) cut took the river on a straight course between Weybridge and Walton on Thames, and avoiding a meandering stretch past Shepperton and Lower Halliford.[30] The cut alleviated flooding in Shepperton[31] and halved the distance of travel on that part of the river.

A Thames Conservancy Act of 1932 Act dealt with construction of jetties and landing stages on the river[32]

In the 1960s modernisation of the locks began with the first hydraulic system introduced at Shiplake Lock in 1961. Sandford Lock was rebuilt in 1972

Replacement

On 1 April 1974, the Thames Conservancy was subsumed into the new Thames Water Authority, although much of the organisation remained intact as the authority's Thames Conservancy Division. However when Thames Water was privatised in 1990 the river management functions passed to the new National Rivers Authority and in 1996 to the Environment Agency.

Locks built by the Thames Conservancy

Chairmen of Thames Conservancy

References

  1. ^ Thacker I p 199
  2. ^ Thacker I p 114
  3. ^ Thacker I p 205-209
  4. ^ Thacker I p221
  5. ^ Thacker I p221
  6. ^ Thacker I p230
  7. ^ Thacker II p470
  8. ^ Thacker I pp 236-238
  9. ^ Thacker I p239
  10. ^ Thacker I pp240-242
  11. ^ Thacker I pp242-243
  12. ^ Thacker II p382
  13. ^ Thacker I pp243-244
  14. ^ Thacker II p366, 277, 187
  15. ^ Thacker II p471
  16. ^ Thacker I pp248-251
  17. ^ Thacker II p257, 207, 234, 221, 383, 199-200, 277, 338
  18. ^ Thacker I p252
  19. ^ Thacker II p266, 289, 315, 59, 409
  20. ^ "The River Thames - Lock Details". www.the-river-thames.co.uk. http://www.the-river-thames.co.uk/locks2.htm. Retrieved 2007-10-31. 
  21. ^ "Richmond Lock and Weir". Port of London Authority. http://www.portoflondon.co.uk/display_fixedpage.cfm/id/2253. Retrieved 2007-10-31. 
  22. ^ "Mechanism - Richmond Lock". The Victorian Web. http://www.victorianweb.org/technology/canals/7.html. Retrieved 2007-10-31. 
  23. ^ "Richmond Lock 2003". Christine Northeast. http://www.cl.cam.ac.uk/~chn2/photos/richmondlock03/. Retrieved 2007-10-31. 
  24. ^ Thacker I p253
  25. ^ Thacker II 37-92
  26. ^ Thacker II 351, 425
  27. ^ Thacker II p471
  28. ^ Thacker II pp 39, 248, 447, 225
  29. ^ Thacker I p 255
  30. ^ The Hundred of Spelthorne: Shepperton
  31. ^ Shepperton Rotary Club
  32. ^ Thames Conservancy Act 1932
  33. ^ Henley Royal Regatta Prizegivers

Bibliography